Skip to main content

Quality Gates

Quality gates prevent weak CTI from becoming weak detections.

Gate A: PIR Approval

Must prove:

  • PIR supports a real defensive decision.
  • Owner and time horizon are defined.
  • Confidence threshold is stated.

Gate B: Scenario Approval

Must prove:

  • Source claims are traceable.
  • Israeli relevance is explicit.
  • Priority score is calculated.
  • Alternative explanations and gaps are visible.

Gate C: Hunt Approval

Must prove:

  • Hypothesis is falsifiable.
  • Telemetry and fields are identified.
  • Query or procedure is scoped.
  • Closure criteria are defined.

Gate D: Detection Design Approval

Must prove:

  • Observable maps to telemetry.
  • ATT&CK mapping quality is M3 or better.
  • False positives and SOC action are documented.
  • Test plan exists.

Gate E: Production Approval

Must prove:

  • DRL-9 requirements are met.
  • Pilot results are reviewed.
  • Triage and rollback are documented.
  • Owner and review date are assigned.

Gate F: Final Delivery

Must prove:

  • Claims, detections, hunts, gaps, and decisions are traceable.
  • Metrics are reported.
  • Remaining risk is explicit.
  • Deprecated or weak items are not presented as production coverage.